Race Against Time
So today was filled with the rush of getting the footings poured before more snow arrived....unfortunately the Wyckoff Township inspector didn't seem to share in our sense of urgency. He finally showed around 1pm and gave the green-light for the concrete pour.
By that time the yard had thawed out and was going to be interesting going for the mixer truck.
First we tried forwards
By that time the yard had thawed out and was going to be interesting going for the mixer truck.
First we tried forwards
Then backwards
But in both cases the mud was too deep, and since no one wanted a truck stuck in the backyard, they had to use the bucket loader to transport the concrete
Shortly after they finished the snow began - hopefully it doesn't last long and they'll start running the block up later this week
Sunday, March 17, 2013
The Footings Saga
Rewind to a little over a week ago, and we were all ready to pour the footings for the foundation
But due to the water table being so high, the inspector decided the ground was too soft and that we needed to bring out a soil engineer. She recommended that we dig off the soft mud down to the clay and then compact some stone for the footings to rest on. In the meantime the wetness grew a bit worse....
And then this happened...
Now a little over a week later we're ready for try #2 on the footings. The forms were ripped out, the compacted stone laid, and in the process they found a previously unknown seepage pit that was a source for much of the water. So things are looking much better now and we're hoping the inspector gives the ok tomorrow morning....stay tuned.